First Site Visit: 08-28-08


7am - labor day - no work on site


Fence locked. Signs posted, large crushed stone as driveway for vehicles. (Q: can the site utilization be coordinated with future locations of finished items, like driveways?)

Cranes on site. The yellow crane belongs to the foundation/form work crew. The white crane in the background belongs to the steel erection crew. It is located in the future gymnasium space and is getting ready for a delivery of steel web-joists for the roof structure.


Posted by Picasa

1 comment:

Mills said...

These cranes, probably not owned by the contractor and quite possibly reversed, lattice boom for steel, white hydraulic for lighter loads and shorter reach. Good shots!